Our Hygrade QLD team were contacted for an urgent weekend repair for a failed Electrofusion Coupling on a 355 HDPE Pipe System.

When considering their recommendation, the team needed to take in to account that there was a slight difference in alignment of the two pipe connections. The pipeline was pressurised, and the client needed product that enabled a quick connection without drying the pipes after draining the pipeline. The perfect solution for a swift and robust outcome was two Synoflex Couplings 300mm (313-356mm OD) PN16.